06 Completed Projects

Airport & Land Preparation Works

Changi East, airfield, land preparation and supporting infrastructure.

← All completed categories
06

Completed Project Record

Airport & Land Preparation Works

8 projects
No.ProjectClientPeriodScope of workMain contractor
11Changi East Airside Road, Parallel Taxiway and Fire Station No. 2CAASOct 2020 – Dec 2021Structural works for ARC tunnelChina Communications Construction Company Ltd
12Changi East Three-Runway Operations — Package ThreeCAASOct 2020 – Aug 2022Advance ARC and drainage structural worksChina Communications Construction Company Ltd
16D2014-00169-C01 — Changi East Land Preparation, Airfield and Ancillary WorksDSTADec 2016 – Dec 2017Drainage, cable duct and substation structural worksKTC Civil Engineering & Construction Pte Ltd
18Changi East Three-Runway Operations — Package OneCAASApr 2017 – May 2018Phase 1 and 2 drainage structural worksKoh Brothers Building & Civil Engineering Contractor (Pte) Ltd
24D2014-00169-C02 — Changi East Land Preparation, Airfield and Ancillary WorksDSTAMar 2020 – Mar 2021Temporary structural worksKTC Civil Engineering & Construction Pte Ltd
25Changi East Workers Dormitory VillageCAASMar 2020 – Mar 2021Structural and wet worksHuationg Contractor Pte Ltd
30Changi East Three-Runway Operations — Package TwoCAASJul 2017 – Dec 2022Main drainage, cable ducts and pavement works for Zones 3 and 4Hock Lian Seng Infrastructure–Sembcorp JV
39Drains, Sewers, Water Pipelines and Ancillary Works at Lim Chu KangDSTAMay 2022 – Jun 2024Drainage structural worksKTC Civil Engineering & Construction Pte Ltd

Project information is based on Tien Seng Engineering's supplied completed-project record.